One of Australia’s leading University’s landmark research building (+$100M) was designed with a complex pressurization and control system to maintain PC2 compliance. The client was experienced...
A University with a large metropolitan campus engaged Bridgeford Group to review an existing oil based solar system serving a High Temperature Heating Hot Water system which has underperformed since...
Bridgeford Group were engaged to review an existing High Temperature Heating Hot Water system central plant with a view to increasing the efficiency of the plant and identifying options for the...