Projects

LATEST PROJECTS

  • Energy Optimisation Upgrades – Aquarena Aquatic Centre
    Energy Optimisation Upgrades – Aquarena Aquatic Centre

    Due to high utility bills and numerous issues around existing energy production, heating and control systems, Manningham City Council engaged Bridgeford Group to perform a Type-2 Energy Audit of...

  • Oil to water conversion for large high temperature solar thermal array
    Oil to water conversion for large high temperature solar thermal array

    A University with a large metropolitan campus engaged Bridgeford Group to review an existing oil based solar system serving a High Temperature Heating Hot Water system which has underperformed since...