Projects

LATEST PROJECTS

  • Frasers Property Group – Rhodes Corporate Park Net Zero Roadmap
    Frasers Property Group – Rhodes Corporate Park Net Zero Roadmap

    SERVICES: Energy, Renewable Energy, Electrical& Mechanical Engineering OBJECTIVE: In 2021, Frasers Property Limited (headquartered in Singapore) committed to becoming a netzero carbon...

  • Hydrogen Park Energy Options Study
    Hydrogen Park Energy Options Study

    The Hydrogen Park Murray Valley Energy Options Study, completed by Bridgeford Group, successfully integrated renewable energy, innovative technologies, and sustainable practices. It served as a model...

  • Energy Optimisation Solutions – Yarra Valley Water
    Energy Optimisation Solutions – Yarra Valley Water

    In early 2021, Bridgeford Group completed the Yarra Valley Water Energy Optimisation project for their head office location in Mitcham, Victoria. This in-depth review and analysis of energy...

  • Solar PV and EV Charging – Power Equipment
    Solar PV and EV Charging – Power Equipment

    Bridgeford Group was engaged to provide advisory services to determine the optimum solar system sizing for a large diesel engine distributor in Melbourne, Power Equipment. This distributor had set...