SERVICES: Energy, Renewable Energy, Electrical& Mechanical Engineering OBJECTIVE: In 2021, Frasers Property Limited (headquartered in Singapore) committed to becoming a netzero carbon...
SERVICES: Strategy Development, Feasibility, Analysis, Investigation OBJECTIVE: Develop a comprehensive electric vehicle charging strategy for Federation University’s Mt Helen Campus. As part...
SERVICES: Architectural Design, Mechanical, Electrical OBJECTIVE: Bridgeford Group successfully completed the design of a modern, fully electrified and efficient AFLW Pavilion at Gordon St,...
In December 2020, Bridgeford Group completed the City of Melbourne Gas Free Operations feasibility and implementation roadmap. The project was a response to their declared Climate Emergency,...
Due to the ageing and non-compliant boiler system located within the SMB Building G Library at Federation University’s SMB Ballarat campus, the Bridgeford Group was commissioned to design the...
In order to progressively remove reliance on natural gas operations, Bridgeford Group performed an engineering based concept study for the electrification of pool heating at the City of Greater...
Monash University engaged the Bridgeford Group to perform a feasibility study to analyse options and considerations for redeployment of the now redundant 2 MVA Diesel generator that used to provide...