Due to the ageing and non-compliant boiler system located within the SMB Building G Library at Federation University’s SMB Ballarat campus, the Bridgeford Group was commissioned to design the...
In order to progressively remove reliance on natural gas operations, Bridgeford Group performed an engineering based concept study for the electrification of pool heating at the City of Greater...
Bridgeford Group was engaged by a regional university to prepare a Net Zero Asset Strategy for one of their dual-sector campuses, with the hope of making the campus a regional exemplar for...
Due to high utility bills and numerous issues around existing energy production, heating and control systems, Manningham City Council engaged Bridgeford Group to perform a Type-2 Energy Audit of...