Projects

LATEST PROJECTS

  • The Ian Potter Centre – Air Handling System Upgrade
    The Ian Potter Centre – Air Handling System Upgrade

    SERVICES: HVAC System Design, Equipment Replacement, Control Strategy, Energy Efficiency Planning OBJECTIVE: The Ian Potter Centre, located at Federation Square in Melbourne, is home to the...

  • Energy Optimisation Solutions – Yarra Valley Water
    Energy Optimisation Solutions – Yarra Valley Water

    In early 2021, Bridgeford Group completed the Yarra Valley Water Energy Optimisation project for their head office location in Mitcham, Victoria. This in-depth review and analysis of energy...

  • Gas Free Operations – City of Melbourne
    Gas Free Operations – City of Melbourne

    In December 2020, Bridgeford Group completed the City of Melbourne Gas Free Operations feasibility and implementation roadmap. The project was a response to their declared Climate Emergency,...

  • Heat Pump Electrification – Kardinia Aquatic Centre
    Heat Pump Electrification – Kardinia Aquatic Centre

    In order to progressively remove reliance on natural gas operations, Bridgeford Group performed an engineering based concept study for the electrification of pool heating at the City of Greater...

  • Mechanical Equipment Upgrade – Critical Services
    Mechanical Equipment Upgrade – Critical Services

    Bridgeford Group recently completed the complex services designs for the major upgrade of the mechanical systems at the Emergency Services Telecommunication Authority 000 Call Centre, Mt Helen...

  • Solar PV and EV Charging – Power Equipment
    Solar PV and EV Charging – Power Equipment

    Bridgeford Group was engaged to provide advisory services to determine the optimum solar system sizing for a large diesel engine distributor in Melbourne, Power Equipment. This distributor had set...

  • Energy Optimisation Upgrades – Aquarena Aquatic Centre
    Energy Optimisation Upgrades – Aquarena Aquatic Centre

    Due to high utility bills and numerous issues around existing energy production, heating and control systems, Manningham City Council engaged Bridgeford Group to perform a Type-2 Energy Audit of...

  • 20MW Thermal Plant Optimisation Study – University
    20MW Thermal Plant Optimisation Study – University

    Bridgeford Group were engaged to review an existing High Temperature Heating Hot Water system central plant with a view to increasing the efficiency of the plant and identifying options for the...