Projects

LATEST PROJECTS

  • The Ian Potter Centre – Air Handling System Upgrade
    The Ian Potter Centre – Air Handling System Upgrade

    SERVICES: HVAC System Design, Equipment Replacement, Control Strategy, Energy Efficiency Planning OBJECTIVE: The Ian Potter Centre, located at Federation Square in Melbourne, is home to the...

  • Ararat Rural Council Gordon St AFLW Design
    Ararat Rural Council Gordon St AFLW Design

    SERVICES: Architectural Design, Mechanical, Electrical OBJECTIVE: Bridgeford Group successfully completed the design of a modern, fully electrified and efficient AFLW Pavilion at Gordon St,...

  • Coates – Pathway to net zero emissions
    Coates – Pathway to net zero emissions

    SERVICES: Sustainability Strategy, Climate Risk Assessment, Energy Efficiency Planning, Emissions Reduction, Value Chain Management OBJECTIVE: Coates, a leading equipment rental and engineering...

  • Energy Optimisation Solutions – Yarra Valley Water
    Energy Optimisation Solutions – Yarra Valley Water

    In early 2021, Bridgeford Group completed the Yarra Valley Water Energy Optimisation project for their head office location in Mitcham, Victoria. This in-depth review and analysis of energy...

  • Energy Optimisation – La Trobe University
    Energy Optimisation – La Trobe University

    The competitive education market has prompted Universities to aim to achieve net zero emissions targets. La Trobe University was one of the first universities to publicly announce a 2029 Net Zero...

  • Heat Pump Electrification – Kardinia Aquatic Centre
    Heat Pump Electrification – Kardinia Aquatic Centre

    In order to progressively remove reliance on natural gas operations, Bridgeford Group performed an engineering based concept study for the electrification of pool heating at the City of Greater...

  • Energy Optimisation Upgrades – Aquarena Aquatic Centre
    Energy Optimisation Upgrades – Aquarena Aquatic Centre

    Due to high utility bills and numerous issues around existing energy production, heating and control systems, Manningham City Council engaged Bridgeford Group to perform a Type-2 Energy Audit of...